Hydro Empowerment Network
  • Home
  • About Us
  • Our Work
    • Approach
    • Advocacy
    • Exchanges
    • Tools
    • Partnerships
  • Our Members
  • Blog
  • Contact

the flow

HPNET AT UN HIGH-LEVEL DIALOGUE ON ENERGY 2021

3/10/2021

0 Comments

 
This month UN-Energy launched the substantive preparations for the High-Level Dialogue on Energy, a summit-level event in September 2021 to accelerate SDG 7 achievements and promote climate action ahead of the COP26 by planning and implementing energy-related goals and targets of the 2030 Agenda for Sustainable Development.  The Dialogue is historic being the first of its kind since 1981.
Picture
Credit: UN Energy
HPNET has been invited to contribute to the initiative as a member in one of the Dialogue’s five Technical Working Groups,  Enabling SDGs through Inclusive, Just Energy Transitions.  This UN Working Group is especially relevant for HPNET members because community-scale hydropower is a multi-thematic intervention that strengthens the water-energy-land nexus for greater climate resilience in marginalized rural communities -- which ultimately advances multiple SDGs in parallel. 
The UN Working Group’s focus on inclusion is also a critical theme for HPNET members:

  • ​Rural communities often bear the brunt of the climate crisis but have the smallest carbon footprint.  In fact, many indigenous communities have practices that sustain forests, mitigating emissions.  It is vital to enable both sustainable development and multi-benefit climate adaptation mechanisms, i.e. watershed strengthening for climate resilient access to electricity, potable water, sanitation, and irrigation.  The best way to do that is to bring the voices of communities to policy-making and funding decisions.  
​
  • Women-centric approaches to hydro mini-grids lead to optimal sustainability and socio-economic benefits from the project.  Critical to the implementation of women-centric approaches are women energy practitioners, who are a few in number, often not acknowledged for their immense contributions, and not typically in leadership positions.

  • ​Donors and governments often inaccurately see mini-grids as being synonymous to solar-battery mini-grids, and discount the energy access progress made in the last forty years by community hydro and biomass solutions, which to date continue electrifying last mile communities.  Although lower cost and more apt for mechanized productive end use, these technologies and the local experts who have advanced them are often sidelined in mainstream funding and policy mechanisms.​ ​
Leveraging  four decades of hindsight from the Asia-Pacific, Africa, and Latin America, our initiative Social Enterprise for Energy, Ecological and Economic Development (SEEED) provides capacity building for practitioners and community to achieve long-term technical, environmental, institutional, and financial sustainability of their hydro mini-grids.  The SEEED approach results in the triple benefits of energy access, climate resilient watersheds, and socio-economic recovery. 

​
Using results from SEEED’s evidence-based analyses and peer-to-peer exchanges, done in collaboration with local practitioners, we look forward to contributing to the UN Energy High-Level Dialogue. Below are further details collated from content provided by UN Energy.

Picture
Htan Hla Pin Community Micro Hydro, Shan State, Myanmar. Credit: Loïs Sevestre

Picture
Credit: UN Energy
​OBJECTIVE
The Technical Working Group III will focus on developing a Theme Report on Enabling SDGs through Inclusive, Just Energy Transitions that presents a set of recommendations towards an action-oriented global roadmap for the achievement of SDG 7 by 2030 and net-zero emissions by 2050. The report should be made in a succinct manner and can be widely consumed by a non-technical audience.

This group will focus on maximizing the positive impacts of inclusive and just energy transitions on the achievement of the SDGS, including gender equality, job creation, youth empowerment, agriculture and food systems, health, education, water, and sustainable production and consumption, through coordinated multi-sectoral interventions. The focus is to move away from ideas of ‘separation and competition’ to one of ‘interdependence and collective action.’
SUMMIT LEVEL DIALOGUE
The summit level Dialogue on Energy will be convened by the UN Secretary-General in New York in September 2021, setting a global roadmap to achieve clean, accessible energy for all by 2030 and net zero emissions by 2050, and mobilizing the voluntary commitments and actions urgently needed.

WATCH: Virtual Launch of the UN High-level Dialogue on Energy 2021
​
0 Comments

IMPACT OF PRACTICE-TO-POLICY DIALOGUE: NEPAL'S FIRST GRID INTERCONNECTED MICRO HYDRO PROJECT

2/16/2018

1 Comment

 
The ​11th of January 2018 was an eventful day for the Nepali micro hydropower community. On that day, the 23 kW Syaurebhumi micro hydro plant, in Nuwakot, got hooked up to the national grid. It became the first micro hydro plant (MHP) in the country to be interconnected, opening the door for other MHPs to follow. For Nepal, dotted with more than 3000 MHPs aggregating to about 35MW installed capacity, of which about 5MW is now un-utilized due to the arrival of the national grid, this interconnection pilot is an important step towards revitalizing defunct MHPs.
Picture
Syaurebhumi MHP stream. Credit: AEPC-RERL
Picture
Syaurebhumi community members. Credit: AEPC-RERL
The Journey to Grid Interconnection

The journey to the interconnection was neither simple nor short. The idea of connecting MHPs to the national grid is not new in Nepal, having been mooted as far back as 2006. By 2015, the Nepal Electricity Authority (NEA) and the Alternative Energy and Power Centre (AEPC) had agreed to the MHP grid interconnection in principle. NEA, which is the sole utility in Nepal, is responsible for the implementation of all grid based electrification under the Ministry of Energy, while the AEPC tends to renewable energy-off grid electrification under the Ministry of Population and Environment. So, the in-principle agreement of the two responsible agencies was a significant step in the direction of MHP grid interconnection. However, in spite of the in-principle agreement, matters moved forward slowly because ‘the reluctance of the NEA reflected in the directives of senior NEA management was not conducive for grid connection’, according to Jiwan Mallik, one of the individuals who worked closely on the interconnection effort. The reluctance was based on a number of question-marks concerning the technical robustness and safety of such an arrangement, as well as the managerial entanglements.  Although AEPC worked steadily to address these concerns, by first drawing up a ‘Micro Hydro Projects Interconnection Equipment Standards and Specifications’, and then performing a financial viability study for grid connection, a pilot was still not forthcoming.
Picture
Syaurebhumi MHP pentock. Credit: AEPC-RERL
Picture
Syaurebhumi MHP civilworks. Credit: AEPC-RERL
HPNET'S INTERMEDIARY ROLE
​
​A small but vital nudge that tipped the NEA policymakers in favour of MHP grid interconnection came in the form of HPNET’s Practice-to-Policy Exchange for Grid Interconnected Micro and Mini Hydropower in South and Southeast Asia workshop held in Sri Lanka, in January 2016. Hosted by pioneering organizations Janathakshan and Energy Forum in Sri Lanka, the workshop had been targeted at policymakers, utilities, and developers of eight countries. The Nepal contingent was drawn from all three sections.  This exchange was exactly what they needed. Within five weeks of the Sri Lanka workshop, the attendees held a follow-up workshop on the 4th of March in Lalitpur, in order to build on the confidence gained from the Sri Lankan evidence of the feasibility of grid interconnection.  In late March 2016, the NEA entered into a Power Purchase Agreement with two MHPs on a pilot basis. One of these was the Syaurebhumi MHP.
​The Syaurebhumi plant was a classic case of an off-grid MHP plant thwarted by the arrival of the national grid. It had been completed in 2013, but as the national grid arrived during its construction, and as the community opted to be serviced by the national grid, the plant lay idle. After the interconnection on the 11th of January, the plant was kept under observation for a period of 15 days.  The outcomes of the period were analysed by a Test Witness Committee comprising officials of both NEA and AEPC, and were found satisfactory. As of 1st of February, 2018, the Syaurebhumi MHP has started commercial operation. 
FINANCIAL VIABILITY
​
The costs to interconnect the Syaurebhumi MHP to the central grid, ~$30,000, was provided as a one-time subsidy from the Government of Nepal for piloting grid interconnection.  Future MHP interconnections will not be subsidized.  The current PPA for the MHP is based on the same rates and conditions as those for bigger hydropower projects up to 25MW. Even with those figures, the Syaurebhumi MHP can earn an annual income of nearly $10,600.  If this pilot is successful, it can rejig the antagonistic relationship of MHPs and the national grid into a complementary one. It can also reframe MHPs from being the only recourse of remote villages to being an active contributor of clean energy to the country. What is more, it can also become a feasible business avenue for local entrepreneurs. 
IMPACT OF PRACTICE-TO-POLICY

For HPNET, the grid interconnection of Syaurebhumi validates our belief that regional practice-to-policy dialogue is an invaluable resource of pooling together knowledge, and can provide the little spark that fires up action. For instance, being able to witness a successful grid interconnection in Sri Lanka gave the Nepali policy-makers the confidence to greenlight the grid interconnection pilot. We hope to be able to continue creating these nodes of inspiration.  Perhaps the next practice-to-policy exchange could even include a field trip to Syaurebhumi!
Now that it is finally on-grid and producing electricity again, many in Nepal will be watching its experience keenly.  We congratulate the teams of NEA and AEPC, as well as the wider Nepali microhydro community for toiling relentlessly over the past decade and bringing this MHP grid interconnection pilot to fruition. We wish them more success.

This blogpost is draws generously on an article by Jiwan Kumar Mallik, and a report from the Nepal Micro Hydropower Development Association. Additional information about the Syaurebhumi Micro Hydro project can be found at the UNDP Nepal website here.

Mibi Ete
​HPNET Member
1 Comment
    Picture

    Categories

    All
    Afghanistan
    Africa
    Bangladesh
    Bhutan
    Cameroon
    Context Profile
    Earth Voices
    Electronic Load Controllers
    Environmental Impact
    Ethiopia
    Events
    Finance
    Gender Equity
    Germany
    Gram Vikas
    Grid Interconnectivity
    Hidden No More
    India
    Indigenous Community
    Indonesia
    Integrated Energy Planning
    International Rivers
    Knowledge Exchange
    Knowledge Tools
    Load Management
    Local Fabrication
    Madagascar
    Malawi
    Malaysia
    Member Profiles
    Mini Hydro
    Myanmar
    Nepal
    Nicaragua
    Pakistan
    Philippines
    Pico Hydro
    Podcasts
    Practice To Policy
    Practice-to-Policy
    Practitioner Profile
    Productive End Use
    Rehabilitation
    Research
    SEEED
    SIBAT
    Sri Lanka
    StreamSide Chats
    Toolkit
    Training Centers
    Videos
    Watersheds
    Webinars
    Yamog

    Archives

    December 2024
    February 2023
    January 2023
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    April 2021
    March 2021
    January 2021
    December 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    March 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    November 2018
    October 2018
    February 2018
    January 2018
    March 2017
    September 2016
    July 2016
    January 2016
    November 2015
    October 2015
    September 2015
    June 2015
    March 2015
    February 2015

HOME
ABOUT US
OUR WORK

OUR MEMBERS
BLOG
CONTACT
© 2015 - 2023
​Hydro Empowerment Network

Proudly powered by Weebly